Multi-Use (hoarding application)
Installation Guide Australia
Tools:
-
Safety Glasses
-
Ear Muffs
-
Dust Mask
-
Tape Measure
-
Skill Saw
-
Drill
-
Button Head Screws/Flange Head Screws
Disclaimer
This document must be read in conjunction with:
-
Material Safety Datasheet
Step 1: Install posts/vertical supports at 1.2m centres.

Step 2: Install top and bottom plate 2.4m apart + central support nog.
Step 3: Any cutting requires mechanical tolls. We recommend using a fine tooth carbide tip saw and clean up with orbital or belt sander.
Step 4: All external edges must be painted with ordinary fence paint before installation, providing a sealed edge to be warranted.
Step 5: Fix boards at 300mm centres using Button or Truss head screws. Alternatively use a flange head screw.
Step 6: All edges and board centres must be supported. If installed horizontally the same edge support must be in place.


Step 7: At the end of the board’s life or at signs of wear, please palletise any boards or offcuts and send to:
saveBOARD
15 Production Ave
Warragamba
NSW 2752
Free disposal service, where the panels will be remanufactured into new saveBOARD products.
