top of page

Multi-Use (hoarding application)
Installation Guide Australia

​Tools:

  • Safety Glasses

  • Ear Muffs

  • Dust Mask

  • Tape Measure

  • Skill Saw

  • Drill

  • Button Head Screws/Flange Head Screws​

​

Disclaimer

This document must be read in conjunction with:

  • Material Safety Datasheet

Step 1: Install posts/vertical supports at 1.2m centres.

step 1 diagram

Step 2: Install top and bottom plate 2.4m apart + central support nog.

​

Step 3: Any cutting requires mechanical tolls. We recommend using a fine tooth carbide tip saw and clean up with orbital or belt sander.

​

Step 4: All external edges must be painted with ordinary fence paint before installation, providing a sealed edge to be warranted.

​

Step 5: Fix boards at 300mm centres using Button or Truss head screws. Alternatively use a flange head screw.

​

Step 6: All edges and board centres must be supported. If installed horizontally the same edge support must be in place.

Diagram 2 for step 6
Screws example for instructions

Step 7: At the end of the board’s life or at signs of wear, please palletise any boards or offcuts and send to:

saveBOARD

15 Production Ave

Warragamba

NSW 2752

Free disposal service, where the panels will be remanufactured into new saveBOARD products.

bottom of page